Documentation
Everything you need
to get spraying.
Installation guides, technical specs, troubleshooting, and downloads — all in one place.
Quick start
Up and running in 3 steps.
Step 01
Mount the modules
Attach ATAR modules to your boom using the universal bracket kit. One PoE cable per module — power and data in a single run.
Step 02
Connect the Central Unit
Wire the Central Unit to your 12/24V supply and connect the air line. Plug in the pressure sensor and ARAG valve if included.
Step 03
Configure & spray
Open the ATAR app on your tablet or phone. Set nozzle count, lead/trail times, and spray mode. You’re ready to go.
Browse by topic
Find what you need.
Hardware & Installation
Mounting, wiring, pneumatic connections, and boom configuration for every sprayer type.
AI & Detection
How the vision system works, model updates, detection modes, and accuracy tuning.
Configuration & Operation
Spray parameters, mode switching, nozzle setup, and field operation best practices.
Pressure & Hydraulics
ARAG valve setup, pressure regulation, flow control, and dual-line configuration.
Connectivity & Integration
CAN bus, ISO-BUS, 4G connectivity, OTA updates, and third-party integrations.
Troubleshooting
Diagnostic tools, error codes, common issues, and maintenance schedules.
Downloads
Technical documents & files.
Questions?
Check our FAQ.
Real questions from real farmers — everything you need to know before, during, and after installing ATAR.
Browse all FAQ →Can’t find what you need?
Our technical support team responds within 4 hours during business days.